I did the last scarf joints and all permanent stations are glued together and most of them are glassed and framed except of station 6.
I stupidly ordered 12kg epoxy with medium viscosity which doesn’t work well for laminating. But now I have enough epoxy for gluing, fairing and filleting for the next months. Another dull move was to cut too much from station 8 away. So I had to do 2 extra joints: