Aliexpress Backbone Bottom Bulkheads Cockpit Coppercoat Costs Deck Dome Electric Engine Fillets Hull Interior Keel Lifepo4 Mast Overview Plywood Rig Scarfing Skeg Steering Strongback
Finishing the hull Thursday, Feb 15, 2024 Sibling Keel Coppercoat The keel was ready to be bolted under the hull. We used the Travellift to set the hull on the keel. The bolts fitted the pre drilled holes and everything worked out as planed.
Aliexpress Backbone Bottom Bulkheads Cockpit Coppercoat Costs Deck Dome Electric Engine Fillets Hull Interior Keel Lifepo4 Mast Overview Plywood Rig Scarfing Skeg Steering Strongback
Links The Junk Rig Association Junk Rig Design Tool Blogs: Voyaging with Annie Hill Speedwell Adventures sailing dawn treader SV Tapatya Salt & Tar Building Rediviva Atanga (german) boat bits The Voyaging Vegetarian FanShi – Wandering and Wondering SERCHTHRIFT Hundred Rabbits
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License